Basic carcass building and subfloor upgrading Part 6 (Turkish Video)

Since the land is sloping and I didn't want to pour too much concrete just to level the road and its scales. That's why I increased the flood level 2 rows with pumice. Next to the foundation concrete width:30cm depth:50cm + 2 rows of pumice were arranged. It's cheaper this way

 